Thursday, April 3, 2014

Using Water for Multiple Purposes

The spring water source located at Chilalo Mountain about 1.8 kms from Chelenko town was harnessed with 25 million birr to ensure water supply for the town about ten years ago.  As the frequent occurrence of stone sliding at the mountain threatened the protective structure constructed at the eye of the spring under the mountain, it necessitated the plantation of vegetation that halted the stone sliding while in the mean time helped recharge the water resource which consequently increased the discharge capacity of the spring. 
Four years later from the launching of the water supply project, Hararghe Catholic Secretariat (HCS) has got involved in the extension of the water supply scheme over 24 kms distance that was carried out in three phases with a total of 10.4 million birr to benefit the rural communities living in Chelenko Lola, Duse, Welteha, Hakebas, Gedera and Dursitu Bilisuma kebeles.
One of the reasons that initiated the extension of water supply from the spring source at Chelenko to the nearby kebeles was noted to be the absence of alternative water sources such as adequate ground water. The efforts made by the water bureau and HSC to dig boreholes at Chelenko Lola kebele upto 61 meter depth failed to provide reliable water supply to the nearby community.
The water supply project was mainly implemented using motorized pumps to push the water up the hill to the 500 cubic meter reservoir at Chelekno town and a gravity scheme down the mountain to supply water to the individual kebeles in the area. 
  
Ato Abiti Getaneh, director of Research and Development Directorate at the Federal Ministry of Water and Energy (MoWE), who travelled to the area with the group of journalists and communication professionals, indicated the purpose of the field visit which he said was to draw important lessons from best practices in water supply projects in the area and disseminate and scale up to other areas in the country.  
Ato Tadesse Regassa, head of Chelenko town water supply authority, noted the impact of the water supply project which was initially intended to serve about 11,000 people living at Chelenko town for 25 years period of time. Ten years later the same source is now providing water supply to over 35,000 residents of the town in addition to the six kebeles being served as a result of the extension work carried out in partnership with HCS. 

W/r Addisalem Mume, vice head of Water, Mineral and Energy bureau of the woreda pointed out the difference the extension work has made in the lives of the people in those kebeles as it has ensured continuous water supply to the people with 22 water points. She also recalled that before the extension of the water supply scheme was carried out to the surrounding kebeles the people in the area used to rely on unprotected water from ponds to meet their demands for water supply which exposed them to various water borne diseases.    
Jawad Yusuf and Chaltu Ahmed who are both grade ten students at Chelenko high school and Meseret Gezu, a 10th grader at the same school noted the difference the availability of water in their area has made in their lives as they used to walk more than one and half hour to fetch water from unprotected water source. But now they could easily tap water at a close range within a few minutes walk. They also said that they are paying upto 25 cents for a 20 litters Jeri can.  
Community involvement
The involvement of the community in the implementation of the project as well as the management of the water resource was noted to be significantly very high. Members of the communities took part in the extension of the water schemes in terms of labour contribution by digging channels for the extension of the water supply scheme. It was indicated that they carried a generator with an equivalent weight of 1000 kg down to the water spring when the project was first initiated before electric power has been extended to the area. They also got involved in the plantation of vegetation which covered a vast area on the mountain to protect the structure and help recharge the water resource in the area. The surrounding communities have successfully enforced their own bylaws to keep out human beings and cattle from the enclosed area for vegetation coverage over the mountain that accelerated the regeneration process. It was noted that though the community around the spring was in the beginning doubtful about the prospect of sharing their water resource to the nearby villages, they were gradually convinced as the amount of water yield rather increased from 160 litter per second to 230 litter per second as a result of the vegetation coverage and the protection of the natural environment. 
The communities were also involved in the management of the water points as Edirs took the responsibility of assigning members of the water committees which are also accountable to the town’s water supply authority that overseas their activities and provides technical support when the need arises. According to the contractual agreement signed with Edirs, individual attendants are assigned for each water point that are entitled to receive 23% of the revenue generated as a payment for their service from the sale of water that costs about 15 cents for a 20 litters jeri can. This arrangement was indicated to have encouraged greater involvement and ownership from the individual attendants as they are ready to provide the required service at any time as the demand arises in the community. Based on the readings of the water meter attached to individual water points, the town water supply authority would collect the payments for the water supply services to effect the cost recovery of the project.  

Increasing water supply coverage
The coverage of water supply in Meta woreda which has 51 kebeles and four town administrations was indicated to have increased to 45% from 29% before the expansion of the water supply scheme in area. In addition to about 35,000 people living at Chelenko town at present, the water supply scheme has now ensured a continuous water provision to more than 25,000 people living in the surrounding kebeles with total beneficiaries from the same source exceeding 60,000. It was indicated that Chelenko town water supply coverage has now reached 94.2%. “The more the number of beneficiaries tapping into the same source, the greater the cost reduction would be to make it more affordable to the communities,” said Gebeyehu Abebe, WASH capacity building officer at HCS. 
Ensuring water quality
In order to ensure the safety of the water supply used for drinking purpose, chemical treatment is centrally applied at the reservoirs in addition to periodically washing the reservoirs once in three to six months period. The protective structures at the eye of the spring and along the extension lines also pointed out to avoid the possible contamination of the water which otherwise might have happened. Moreover, household water treatment was indicated to be part of sanitation and hygiene promotion effort carried out by HCS in integration with the water supply projects. 
As a result, data collected from the health centers in the area noted to have shown significant decline in diarrheal cases and water borne diseases which was said to be among the top ten health problems in the area. These problems were pointed out to be still observed in other kebeles which do not yet have access to such kind of safe water supply from protected sources. 
Integrated approach
Alemayehu Teshome, Integrated Rural WASH Team leader at HCS, highlighted the unique features of the MUS project at Chelenko among which he noted the integration of rural and urban water supply schemes, and the development of nursery to promote vegetation coverage and boost water supply to the beneficiaries. The integration of the woreda and town administration, HCS and the communities was also cited as exemplary which enabled a successful and equitable resource utilization among a wide range of communities in the area. The water supply scheme was so designed to provide multiple use of water such as for drinking, shower, laundry, and irrigation practices as well as cattle trough. It has also provided water supply to institutions in the area including five schools and a church.

The promotion of ecological sanitation and personal hygiene education as part of the water supply project was also cited as a good example for integration between water supply and sanitation and hygiene promotion. Using Participatory Hygiene and Sanitation Transformation (PHAST) approach before CLTCH was adopted, 620 slabs were distributed to households which constructed toilet facilities in their compound. Two kebeles from each of the five woredas in Eastern Hararghe have been selected for sanitation and hygiene promotion being carried out by HCS. 
Ensuring sustainability
In order to ensure the sustainability of the water supply project in the area, Edirs from individual communities were given the responsibility to protect the water supply schemes within their locality. Selected members from the community were also given training to handle minor maintenance with the provision of the required technical support from the water authority for any major maintenance beyond their capacity. The involvement of the community was also reflected in the close follow up of the water supply schemes in their area as they usually report any damage they spotted along the structures right away to the concerned authority for immediate maintenance service.    
 
Sanitation Marketing
It was indicated that sanitation marketing groups have been involved in the provision of WASH services as they were providing slabs on sale to individual households that have been triggered to construct their own latrine. A private vendor in Western Harrarge was also noted to have been involved in the provision of spare parts for WASH facilities on demand with a fixed profit margin indicated in the contractual agreement signed among the woreda water bureau, HCS and the concerned individual. It was also indicated that market assessment was carried out to identify fast moving items that require constant supply to ensure sustainability of WASH facilities in the area. 
Scaling up
To expand the MUS project at Chelenko to reach at more number of beneficiaries from other kebeles in the surrounding area, Ato Alemayehu pointed out that a regular assessment of the current discharge capacity would be carried out before initiating further expansion work. But similar efforts were noted to have been carried out with lesser degree of success as in the case of the Borehole dug at Kulubi area to provide water supply to the surrounding communities in the neighboring villages. Promoting the MUS approach of water supply projects in other parts of the country has been noted crucial to meet the increasing demands of WASH services and ensure the sustainability of WASH schemes for a long period of time.       


 

In search of the precious commodity on earth

The topography of Kola Nurena kebele in Sodo woreda of Gurage zone is largely mountainous which is covered with vegetation. Despite these natural endowments, water is scarcely available in the area, which appears to have made life increasingly more difficult. The only accessible source of water in the kebele is indicated to be Lebu River that flows through the valleys which makes fetching water very tiresome due to the long distance they have to cover and the difficult terrain they tread on. Men usually use donkeys to fetch water as it would be very wearisome to carry Jeri cans filled with water while walking such a long distance up and down the hills. They have to rise up early in the morning to walk for more than eight hours just to bring back home the precious commodity.  
        The natural setting of Kola Nurena kebele in Sodo woreda of Gurage zone 
        (Photo: Aklil Tsegaye)

About 100 community representatives from the kebele held a community conversation on 6 June 2013 to voice the critical problem of access to water supply in their area. The community conversation was organized by FANA Broadcasting Corporate (FBC) in collaboration with the woreda administration and WASH Ethiopia Movement. The participants indicated that they have to travel about 10 kilometers a day to find the amount of water they need to use for household consumption. 


Birhan Amare, a resident in the area, pointed out the health impacts of the poor quality of the water they use for drinking purpose as there were times they had to sell their cattle to cover the medical expenses due to repeated exposure to infectious diseases. He also said that apart from the three months raining season in the area which is reportedly getting shorter and shorter recently, the springs dry out during the remaining long period of the year which makes their suffering increasingly unbearable. “How could one live without water?” he remarked.

The participants of the discussion indicated that they have started using toilet facilities they constructed since two years back, though they could not practice proper handwashing due to shortage of water in the area. They also pointed out that they could only take a bath not more than once in a month. 

Even though some of the participants indicated to wash their hands whenever necessary, many others contested this claim saying that they might wash a couple of times a day mainly before eating, with a bowl of water repeatedly used not to waste the hard earned amount of water they usually have. Others even indicated to use just soil as an unlikely alternative to clean their hands. 
The community representatives pointed out their effort to treat the water through distillation before they use it for drinking or cooking purpose. They said that they use the same water source for both themselves and their cattle, but those who arrive at the spot ahead of others are the ones who would be able to use the scarce water available at the source usually early in the morning. As a result, their cattle are only able to drink water once in two or three days while every household has to also use the amount of water they could collect at once for two subsequent days before they have to travel again to fetch more water.

A vast hectare of land given for agricultural investment in their area was pointed out to pose yet another challenge for the community as they were not allowed to follow the route crossing the land to the distant water source, which added yet another burden to the existing challenges. 

                          Worried about the availability of water (Photo: Aklil Tsegaye)

Participants indicated to have reported the increasingly difficult situation they have encountered to access water to the kebele administration which has not yet been able to respond to their problem accordingly. They also expressed their readiness to contribute to any intervention effort intended to alleviate their water shortage both in financial terms and human labour. Some of the private business owners originally from the area were also reported to have expressed their willingness to contribute to water development projects in the area as they did in the case of the construction of 19 kilometers road from across the area to the nearby town. 

Memre Meaza Sima, a priest from the local parish of Saint Mary church, also expressed the critical shortage of water in the area which extends particularly in the long dry seasons that would make it very difficult to find the small amount of water needed during the mass ritual ceremony being carried out at the church.

Students from Menkir Gebre-Mariam elementary school who took part in the community conversation indicated the impacts of the shortage of water in the area on their educational performance as they do not usually drink water the whole day until they come back home as there is no water source in their school compound or in the nearby area. Even though there is toilet facility at the school they do not have water to wash their hands after using the toilet. 

Earlier efforts to tap the ground water with a pipeline was indicated to have been short lived as the water would dry out immediately particularly in the dry season. The increasingly critical shortage of water in the area was noted to get worse from time to time driving people away to other areas looking for better living conditions.

Ato Belayneh Seifu, head of Sodo woreda water and energy bureau, indicated the rate of access to safe water in the woreda within 0.5 kms in towns and 1.5 kms in rural areas to have reached 80% and 28% respectively which made the average access rate of the woreda 34%. He added that the current rate of access is far short of the 71% target set to be achieved by 2015. In line with the Growth and Transformation Plan (GTP), Ethiopia has set the targets to reach 98% rural, and 100% urban access rate to safe drinking water which would make the combined national access rate 98.5% by 2015. With two years remaining to reach these targets, the National WASH Inventory indicated that the national water supply access rate was 58.25% in 2004 E.C. with 55.21% in rural and 78.71% in urban areas.

Ato Belayneh acknowledged the serious water shortage problem in the area which demands the construction of at least ten water points at different locations in order to effectively tackle the existing shortage. He outlined the strategic directions set by the woreda administration to improve access to safe water in their locality, which includes the participation of the community, development partners, the private sector and the relevant government bodies, with the later playing more of a coordinating role to bring all the actors together to effectively tackle the problem. He recognized the contribution of development partners such as German Agro Action, CCF, Care Ethiopia, Kalehiwot Church for the achievements made so far in the woreda to improve access to safe drinking water. 

The kebele has a total population of more than 2000 people who do not yet have access to potable water sources within 1.5 kms radius as stipulated in the national strategic direction to improve WASH conditions in the country.